How do you put on a metal roof?

Short answer. A metal roof goes on in this order: tear off or prepare the old roof, repair the deck, install high temperature underlayment, set eave trim, then install panels square to the eave with the specified screws or clips, followed by flashing, closures and ridge cap. Getting the first panel square and the trim laps right decides whether the roof stays dry for decades.

Preparation

Installation sequence

  1. Eave trim, then valley flashing, before any panels.
  2. First panel square to the eave, starting at the end the manufacturer recommends for side lap direction.
  3. Exposed fastener panels: screws with sealing washers in the flat or on the rib as the manufacturer specifies, in the pattern for your wind zone.
  4. Standing seam: hidden clips at engineered spacing, with seams snapped or mechanically seamed closed.
  5. Penetrations with flexible pipe flashings made for metal, and custom flashing at chimneys.
  6. Rake trim, sidewall and headwall flashing, then closures and ridge cap.

Mistakes that shorten its life

Metal is less forgiving than shingles, so installer experience matters. Check permits and HOA rules first. See metal roofing in Georgia and roof flashing explained.

In depth

Architectural or 3-tab shingles: which is right for a Georgia home?Architectural vs 3-tab shingles in Georgia: weight, wind warranties, lifespan, availability as 3-tab lines shrOSB or plywood roof decking: which is better, and what happens at a reroof?OSB vs plywood roof decking in Georgia: span ratings and thickness, how each fails when wet, plank decks, and Synthetic underlayment or felt paper: which should go under your shingles?Synthetic underlayment vs asphalt felt under Georgia shingles: performance, what the 2024 IRC requires, and th