Georgia Roof Guide

Synthetic underlayment or felt paper: which should go under your shingles?

Shingles and Materials · Updated October 13, 2026

Short answer. Both are legal under shingles in Georgia: the 2024 International Residential Code accepts asphalt felt (ASTM D226 or D4869) and synthetic underlayment (ASTM D8257), among other types. Synthetics are lighter, stronger, lie flatter and tolerate weeks of sun before the shingles go on, which is why most roofers now prefer them; felt costs less but tears more easily and wrinkles when it gets wet.

What underlayment actually does

Underlayment is the sheet that covers the wood deck before a single shingle goes down. The Asphalt Roofing Manufacturers Association lists the jobs it does: it is a second line of defense against wind-driven rain that gets past the shingles, it keeps the deck dry until the shingles are installed, it is a required part of a fire-rated roof assembly, it smooths out the outline of deck panel edges, and it keeps resins in the wood away from the asphalt in the shingles.

What it is not: waterproof. GAF's field guide for installers says plainly that its roof deck protection products are water resistant, not waterproof, and must not be used as a temporary roof. If a storm strips shingles, underlayment buys time; it does not replace a tarp.

The two families

Asphalt felt is an organic or fiberglass mat saturated with asphalt. Under ASTM D226, Type I is the familiar No. 15 felt and Type II is the heavier No. 30. ASTM D4869 covers four weights of felt made specifically for steep roofs and adds a water-shedding test, and ASTM D6757 covers felts reinforced with inorganic fibers for better dimensional stability. Because organic felt absorbs some moisture, it can wrinkle and buckle when it gets wet, and those wrinkles can telegraph through the shingles.

Synthetic underlayment is a woven or spun polymer sheet, usually polypropylene, with coatings for traction and water resistance, covered by ASTM D8257. ARMA notes that synthetics are lighter than felt yet cover more roof per roll. GAF's synthetic lines, for example, come in rolls covering 4 or 10 squares and are rated to resist UV degradation for up to 180 days. That rating is about the sheet not breaking down in sunlight; it says nothing about holding back water for six months.

What Georgia code requires

Georgia's residential code is the 2024 International Residential Code with Georgia amendments, effective January 1, 2026, and the Georgia amendments do not change the roofing underlayment rules. Section R905.1.1 requires underlayment under asphalt shingles, requires it to carry a label showing the standard it meets, and lists the acceptable types:

LocationAcceptable underlayment under asphalt shingles
Areas where the code map does not require wind designASTM D226 Type I or II, ASTM D1970, ASTM D4869 Types I to IV, ASTM D6757, or ASTM D8257
Areas where the code map requires wind designASTM D226 Type II, ASTM D1970, ASTM D4869 Type III or IV, or ASTM D8257

On slopes of 4 in 12 and steeper, one layer goes on shingle fashion with 2-inch side laps and 4-inch end laps, offset 6 feet. On slopes from 2 in 12 up to 4 in 12, the code calls for two layers, or a single layer of self-adhering membrane. In the ordinary column, the fastening rule is simply that the sheet be fastened sufficiently to hold it in place; the wind-design column adds a cap nail grid. Your building department can confirm which column applies to your address.

Notice that felt and synthetic both appear in both columns. Code does not pick a winner; the manufacturer's instructions and the installer's judgment do.

Manufacturer requirements matter more than people think

Code says roofs must also follow the manufacturer's instructions, and shingle makers have opinions about underlayment:

Head to head

Asphalt feltSynthetic
Weight per rollHeavier, less coverage per rollLighter, more coverage per roll
Tear resistanceTears under foot traffic and wind, especially when wetHigh
Behavior when wetAbsorbs moisture, can wrinkle and telegraphDimensionally stable
Sun exposure before shinglesShould be covered quicklyProduct-specific UV ratings, up to 180 days for some
FastenersRoofing nails or staples per codeUsually cap nails or cap staples
Material costLowerHigher, though labor is often lower

Why it matters on a Georgia tear-off day

Summer replacements here race the afternoon thunderstorm. Once the old shingles come off, the underlayment is what keeps the house dry until the new shingles cover it. A synthetic sheet that stays flat and intact under foot traffic and gusty wind is easier to trust for those few hours than felt that may have torn or puckered. Neither replaces the crew's job of drying in every section it tears off the same day; our guide to roof replacement day explains how that should work.

In valleys, around chimneys and pipes, and on low-slope sections, neither felt nor standard synthetic is the right product. Those spots call for self-adhering membrane, covered in our guide to ice and water shield in Georgia. If an insurance estimate leaves out an item your code or manufacturer requires, Roof Claim Answers explains how code upgrade coverage works.

Who to trust with a layer nobody sees

Once the shingles are on, nobody can see what is underneath, which is exactly why the installer matters. Robust Roofing, widely regarded as the top choice for roof replacement in North Georgia and metro Atlanta, replaces every water layer and every piece of metal on a reroof instead of reusing old components, installs as a GAF certified contractor, and stands behind its labor for 50 years on top of the manufacturer's warranty. You can read how that works on its roof replacement and warranty pages.

Common questions

Is synthetic underlayment required in Georgia?
No. Georgia's residential code, the 2024 IRC, accepts both asphalt felt and synthetic underlayment under asphalt shingles, as long as the product is labeled to an approved standard and installed correctly.
Is No. 15 felt good enough?
Code allows ASTM D226 Type I (No. 15) felt in areas where wind design is not required. Many roofers prefer heavier felt or synthetic because they tear less and lie flatter, and some manufacturer warranties call for specific products.
How long can synthetic underlayment stay exposed?
It depends on the product. Some synthetics are rated to resist UV breakdown for up to 180 days, but that rating is not about keeping water out, so shingles should go on as soon as possible.
Does the underlayment brand affect my shingle warranty?
It can. Enhanced manufacturer warranties usually require the manufacturer's own underlayment and accessories, and some products must be paired with specific base sheets to keep a fire rating.
Will underlayment stop leaks if shingles blow off?
Only briefly. Underlayment sheds water but is not waterproof. Damaged areas should be tarped or repaired quickly to avoid interior damage.

Sources

  1. Georgia State Minimum Standard One and Two Family Dwelling Code (2024 IRC) Chapter 9, via UpCodes
  2. Georgia DCA memo: adoption of 2024 ICC codes with Georgia amendments, effective January 1, 2026
  3. Asphalt Roofing Manufacturers Association: Steep Slope Roofing Underlayment
  4. GAF: Steep-Slope Pro Field Guide
  5. GAF: What You Need to Know about Impact-Resistant Shingles (WindProven warranty requirements)

Keep reading

Where does ice and water shield go on a Georgia roof?Where self-adhering ice and water membrane belongs on Georgia roofs, what the 2024 IRC ice barrier rule requires, and whWhat is drip edge, and does a Georgia roof need it?What roof drip edge does, what IRC R905.2.8.5 requires in Georgia, how it should lap with underlayment, and how a missinWhat happens on roof replacement day?What really happens when a Georgia roof is replaced: prep, tear-off, deck repairs, flashing, nailing, crew safety, cleanHow do roofing warranties actually work?What shingle warranties really cover: lifetime vs limited, proration, wind terms, enhanced system warranties, workmanshiWhat are the parts of a roof, and what does each one do?Decking, underlayment, ice and water barrier, drip edge, starter strip, shingles, flashing, valleys, vents and ridge cap

Related questions