What do ice and water shield details look like at eaves, valleys, walls and pipes?
Eave
Drip edge is nailed to the deck first, then the membrane laps over its flange, the same order the code sets for underlayment at eaves. Some membrane makers show an alternate eave detail, so follow the product's drawing. Where an ice barrier is required, it reaches at least 24 inches inside the exterior wall line, often in two rows.
Rake
Membrane or underlayment goes on first and the rake drip edge goes over it, so wind-driven water cannot get behind the metal.
Valley
A full-width sheet is centered in the valley and pressed into the crease without bridging, starting at the bottom so upper pieces lap over lower ones by about 6 inches. Underlayment on each slope laps over its edges.
Sidewall and headwall
A strip on the deck turns several inches up the wall sheathing. Step flashing or apron flashing goes over it, and the house wrap and siding lap over the flashing.
Pipe and vent
A square of membrane is cut over the pipe so it extends well beyond the boot flange on every side, then the boot goes on top, with shingles lapped according to the boot's instructions.
Chimney and skylight
Membrane goes on the deck around the full perimeter and turns up the sides, installed bottom first, then sides, then the upslope piece lapping over the side pieces. Step flashing, the backer or cricket flashing and counterflashing complete the detail.
See roof flashing explained, chimney leaks and crickets and ice and water shield in Georgia.