How far should a metal roof overhang the drip edge?

Short answer. Metal roof panels usually extend roughly 1 to 2 inches past the eave trim or drip edge, enough for water to drop clear of the fascia and into the gutter, though the panel manufacturer's details govern. Rake edges are different: the panel stops short and a rake trim covers it, with no exposed overhang.

Why the overhang matters

Water clings to the underside of metal and will curl back along it if the edge stops flush. A short overhang gives it a clean place to drip. Too little and water wicks back onto the eave trim, the fascia and the back of the gutter. Too much and the unsupported panel ends can flutter in wind, sag over time, and overshoot the gutter in heavy rain.

Eaves vs rakes

Gutters change the target

With gutters, aim for the drip line to land over the inside half of the gutter. Fast-moving water off a steep, slick metal roof can jump a gutter during Georgia downpours, so some roofs need a gutter set slightly lower, a larger gutter, or a diverter at valleys.

See how edge metal works in drip edge explained, the broader pros and cons in metal roofing in Georgia, and gutter sizing in gutter sizing and seamless gutters.

In depth

What is drip edge, and does a Georgia roof need it?What roof drip edge does, what IRC R905.2.8.5 requires in Georgia, how it should lap with underlayment, and hoSynthetic underlayment or felt paper: which should go under your shingles?Synthetic underlayment vs asphalt felt under Georgia shingles: performance, what the 2024 IRC requires, and thAre impact-resistant (Class 4) shingles worth it in Georgia?What UL 2218 Class 4 really tests, what it does not promise, how Georgia's FORTIFIED discount law works, and w