Georgia Roof Guide

Do you have to put down underlayment, and how do you put it down?

Short answer. Yes. Building codes and every major shingle manufacturer require underlayment over the deck before shingles go on. Put it down on a clean, dry deck starting at the eave, with leak barrier in valleys and around penetrations first, then roll the field underlayment in overlapping horizontal rows and shingle over it promptly.

Why it is required

The International Residential Code lists approved underlayment types for asphalt shingles, and shingle fire ratings and warranties assume an underlayment is in place. Shingles shed water, but wind-driven rain, ice and the occasional lifted tab push water underneath them. Underlayment is the second line of defense that keeps that water off the wood.

Before you put it down

Putting it down

  1. Leak barrier in valleys, around chimneys and skylights, and wherever else you are using it.
  2. Field underlayment from the eave up, each row lapping the one below by the printed amount.
  3. Cap fasteners in the printed pattern.
  4. Rake drip edge over the underlayment.

Timing

Every synthetic has a UV exposure limit, and felt wrinkles if it gets rained on and sits. Summer afternoon storms in Georgia build fast, so the safest plan is to put down only what you can shingle the same day.

See synthetic underlayment vs felt and what to expect on replacement day.

In depth

Are impact-resistant (Class 4) shingles worth it in Georgia?What UL 2218 Class 4 really tests, what it does not promise, how Georgia's FORTIFIED discount law works, and wWhat shingle color is best for a hot Georgia summer?How shingle color changes roof and attic heat in Georgia, what cool roof shingles really reflect, where to finWhat are the types of roof flashing, and should old flashing be reused?Step, counter, apron, valley and kickout flashing explained for Georgia homes, what the code requires, and why

People also ask